Monitor Components; Installing And Replacing The Batteries - Salter BPA-9301-EU Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 24

Monitor Components

AIR CONNECTOR PLUG
LCD DISPLAY
Component list of pressure
measuring system
1 Cuff
2 Air pipe
3 PCBA
4 Pump
5 Valve
List
1. Blood pressure monitor BPA-9301-EU
(Please use Salter Authorized cuff. The size of the actual
cuff please refer to the label on the attached cuff.)

Installing and Replacing the Batteries

• Open the battery cover.
• Install the batteries as indicated in the battery compartment.
(Always select the authorized / Specified battery:
Four AAA-size alkaline batteries).
• Replace the battery cover.
Replace the batteries under the
following circumstances:
displays on the LCD
• The LCD display is dim
• When powering on the
monitor, the LCD doesn't
light up.
CUFF
AIR HOSE
2. Cuff (Type BF applied part)
22cm-42cm)
CAUTION
• Do not use new and used batteries together.
• Do not use different types of batteries together.
• Do not dispose the batteries in fire. Batteries may explode or leak.
• Remove batteries if the device is not likely to be used for some time.
• Worn batteries are harmful to the environment. Do not dispose with daily garbage.
• Remove the old batteries from the device following your local recycling guidelines.
6 I UK
MEM BUTTON
SET BUTTON
START/STOP BUTTON
DC POWER SOCKET
BATTERY COMPARTMENT
3. 4×AA alkaline batteries
4. User manual

Publicité

Table des Matières
loading

Produits Connexes pour Salter BPA-9301-EU

Table des Matières