Pre-Installation; Parts Enclosed - Jetvent Fans JVEC-ULP Manuel D'utilisation

Table des Matières

Publicité

PRE-INSTALLATION

The safe installation and operation of equipment supplied by Zoo Fans is the responsibility of the system designer, installer,
maintainer, and operator (collectively, the "User"). The need for protective safety accessories to meet company standards,
applicable codes, and the requirements of the Occupational Safety and Health Act ("OSHA") must be determined by the
User since safety requirements may vary depending on the location and application of the equipment.
The elements of a successful installation consist of:
1. Good layout of fans, wiring, and controls
2. Hanging the fans where they'll be most effective and convenient to control
3. Completing the electrical hook-up
4. Start-up and commissioning
5. Conducting all work in a safe manner consistent with all relevant codes and regulations
PARTS ENCLOSED
If you ordered multiple fans, be sure to keep the components of each fan together.
JetVent Fan
Installation Guide (this manual)
Variable speed controller (optional, as ordered)
1

Publicité

Table des Matières
loading

Table des Matières