Télécharger Imprimer la page

Sharp SKCD24U0GS Instructions D'installation page 5

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION INSTRUCTIONS
6. Install the wooden cleats. Align the bottom of the cleat to the
measurement from Step 5. The pedestal can be installed
flush or standard with the face of the cabinet. Depending
on the preference, the depth of the cleat position should
be adjusted as such. See Figure 6. Position each cleat and
mark the holes on the cabinet. Pre-drill each hole in the
1
cabinet using a
/
" (1.6 mm) drill bit. Attach both cleats
16
using the 4 mounting cleat screws. See Figure 7.
STANDARD MOUNT
UTC DRAWER FACE
X
CABINET FACE
CLEAT
*NOTE: WHEN USING CONTRACTOR CABINET FACES,
ADD OR SUBTRACT ADDITIONAL DIMENSION.
SUPPLIED DRAWER FACES ARE 1
MOUNTING CLEAT SCREWS
FIGURE 6
FLUSH MOUNT
Y
UTC DRAWER FACE
CABINET FACE
CLEAT
3
/
"
16
FIGURE 7
7. Slide the unit into the opening. Plug oven into the wall
receptacle prior to pushing the unit all the way in. See
Figure 8. The mounting angles of the oven should rest
against the installed wooden cleats.
NOTE:
• To aid in sliding the unit into the space, open the bottom
drawer and use middle frame to push into place. In
addition, there are built-in handles on each side of
the pedestal that can assist in the movement of the
unit. Tuck cord behind the oven before pushing the
assembled unit in.
• If the chosen height of the installation presents a gap
between the counter top and the unit, attach cabinet
filler strip as noted in Figure 8. Cabinet filler strip can be
purchased wherever cabinets are sold.
5
FIGURE 8
E

Publicité

loading