Electrical Data - Field Controls GVD-4 Manuel D'instructions

Masquer les pouces Voir aussi pour GVD-4:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

OPERATION
When the boiler receives a call for heat, the damper rotates to the open position before the burner circuit is
energized. If the damper does not rotate to the open position, the burner circuit will not be energized. When
properly installed, the electrical circuits in this product are designed not to override the existing limit and
safety controls of the appliance.
WARNING: Before installing the vent damper:
1. Read this manual carefully and completely.
2. Be sure to follow all procedures and safety inspections.
3. Do not negate the action of any safety or operational controls.
4. The vent damper is not for retrofi t in Canada.
TO THE USER
For continued safe operation the appliance device combination should be inspected annually by a qualifi ed
service agency. It is recommended that the homeowner should have the vent system and the damper device
examined annually for deterioration from corrosion or other sources. This inspection should be performed
prior to and during each heating season.
GENERAL INFORMATION
DIMENSIONAL DATA
Figure 1

ELECTRICAL DATA

Minimum Wiring Requirements
Thermostat Heat Anticipation
Power Draw Requirement
Timing
P/N 46352700 Rev J 05/19
A
B
Tube Size
Length
(Inches)
(Inches)
(Inches)
±1/16"
±1/16"
4
6
5
6
6
6
1
2
7
7
1
16
8
8
1
16
9
10
1
8
10
12
1
8
12
12
1
8
24 VAC, 18 gauge, 105C
Add an additional 0.1 Amp to the
specifi ed or measured control circuit amps
3W at 24 VAC when opening or closing
15 seconds, Power open
15 seconds, Power close
page 2 of 20
C
Total
D
Height
(Inches)
(Inches)
±1/16"
±1/16"
±1/8"
8
5
7
8
8
9
5
7
8
8
10
1
5
3
1
4
8
11
1
3
3
4
8
12
1
7
5
7
8
8
13
2
9
5
7
8
8
14
3
11
5
7
8
8
16
3
11
5
7
8
8
E
Weight
(lbs.)
5
2.50
5
2.70
3.10
1
2
6
3.55
4.40
1
16
6.27
1
8
6.95
1
8
8.75
1
8

Publicité

Table des Matières
loading

Table des Matières