Kohler K-7308 Guide D'installation page 6

Masquer les pouces Voir aussi pour K-7308:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Stop
Adjustment
4. Installation Checkout
Ensure that all connections are tight.
Open the drain.
Turn on the main water supply.
Slide the key provided onto each cold and hot stop adjustment.
Turn counterclockwise to open.
Proceed to "Note" instructions for regular or vandal-resistant
aerator removal.
NOTE: For a regular aerator, twist the aerator counterclockwise until
it is removed from the spout.
For a vandal resistant aerator, insert the special wrench up into
the aerator. Twist the special wrench counterclockwise until the
aerator is removed from the spout.
Open both hot and cold valves.
Run water through the spout for approximately one minute to
remove debris. Check for leaks.
Remove any debris from the aerator and reinstall.
113701-2-AB
All manuals and user guides at all-guides.com
Key
Valve
Aerator
Special
Wrench
6
Kohler Co.

Publicité

Table des Matières
loading

Table des Matières