1. Install the Supply Stops
NOTE: Ensure that one flange is threaded onto each cold and hot
supply stop.
Apply thread sealant onto the exposed threads of each cold and
hot 1/2" NPT supply pipe.
Slide one supply stop assembly onto each cold and hot 1/2" NPT
supply pipe.
Thread each cold and hot supply stop assembly until the flange is
snug against the sink or finished wall.
Kohler Co.
All manuals and user guides at all-guides.com
1/2" N.P.T.
Supplies
8" (20.3 cm)
on Center
Stop
3
113701-2-AB