Wellis Sorrento plus Serie Guide D'installation page 2

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

General Information
EN
Please inspect the product immediately upon receipt for transit damage, missing packs/parts or
manufacturing fault Damage reported later cannot be accepted Please handle the product with
care avoiding knocks and shock loading to all sides and edges of the glass.
Note: Safety glass can not be re-worked.
Installation
Please read these instructions carefully before start of installation
The wall post has up to 20 mm of adjustment for put of true wall situations.
Ensure that the shower tray is fitted level and that after assembly of enclosure there is a and con-
tinuous bead of sealant between the top of the shower tray and the tile joint.
Special care should be taken when drilling walls to avoid hidden pipes or electrical cables.
Note: This product is heavy and will require two people to install.
Please remove protective film from aluminium profiles before installation.
Shower Tray Installation
The shower tray must be sited against a structural wall.
Water proof walling or tilling should be fitted so that it sits on the top of the tray rim.
Aftercare Instructions
After use ,your shower should be cleaned with soap and water This is particularly important in hard
water districts where insoluble lime salts may be deposited and allowed to build up. Cleaners of
a gritty or abrasive nature should not be used. Care Should be taken to avoid contact with strong
chemicals such as organic solvents and strippers.
Glass cleaners can be used but with caution, if in doubt contact the supplier of the cleaner in ques-
tion.
Please keep these instructions for aftercare and customer service details
Tools Required
This product is heavy and may require two people to install.
WC00499-WC00506_Sorrento_plus.indd 2
2021. 04. 27. 10:23:44

Publicité

Table des Matières
loading

Table des Matières