Disposal Of The Granulate - BRÖTJE NEOP 70 Instructions De Montage

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 21
Maintenance
GB
Fig. 5: Filling height
4
MAX
Centrale de Neutralisation
Kondensat-Neutralisation
Neutralisation station
MIN
7. Fill granulate to the filling height label (4) in the vertically positioned neutrali-
sation pipes ( Fig. 5 )
Note: A clearance of min. 3 cm must be maintained above the granulate.
8. Reinsert the plug filters
9. Reconnect the inlet and outlet lines
10. Tighten all connections and check all for leaks
11. Attach "Service" label clearly visible on the gas condensing boiler
12. Log service in the Proof of Service (see section Proof of Service)

5.3 Disposal of the granulate

The granulate disposes of itself automatically. The carbon dioxide in the conden-
sate combines with the granulate to magnesium hydrogen carbonate, the NOx
combines with the granulate to magnesium nitrate
Granulate residue can be disposed of in the normal household rubbish.
7311617-02 08.13
Neutralisation unit NEOP 70
19

Publicité

Table des Matières
loading

Produits Connexes pour BRÖTJE NEOP 70

Table des Matières