During Assembly - Palram Lean To Grow House 4'x2' Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 6
During Assembly
Make sure the base is square by measuring the diagonals and level by using a spirit level.
You may use silicon lubricant spray in order to help you slide the rubber seal (Steps 14a+18b)
into the profiles.
Use a rubber mallet if necessary.
When encountering the information icon, please refer to the relevant
assembly step for additional comments and assistance.
This icon indicates
that the installer should
be inside the product.
Attention
This icon indicates that
1 the installer should be
outside the product.
During assembly use a soft surface below the parts to avoid scratches and damages.
Steps
Step 7: Please note the assembly direction of profile #7857.
Step 14a+ 18b: You may use silicon lubricant spray in order to help you slide the rubber seal into
the profiles.
Step 17: A 7mm hole (3/8") must be drilled through the pre -drilled hole in profile #7853 (Detail a)
and through the Polycarbonate panel.
Step 20: Nut (#466) should be fully tightened and then slightly loosened in order to allow smoother
motion of the pulley.
Step 21: Please note, while assembling the door, make sure it is parallel to the upper rail thus
allowing easier motion. If it is not parallel, the nuts should be a bit loosened, repositioned and
tightened again.
Step 24: Anchoring the product to the wall (Details a, b & c).
Choose the appropriate screws for the type of wall you want to attach the product to. (Screws and
screw anchors are not supplied with the product).
* Please tighten all screws when completing assembly.
.
Screws 411 and nuts 466 are used thruoghout the assembly process.
.
Screws 411 are to be assembled from the outside and nuts 466 from the inside of the
greenhouse.
.
Do not fasten screws and nuts (411 & 466) more than 2-3 turns only. Do not tighten
them until completion of the panels' assembly, if not specified otherwise.
.
However, in some steps, temporary tightening of a few screws may be needed to
prevent a profile from falling.
Note: Firmly connect the product to a level surface immediately after completion of the
assembly.
Anchoring this product to the ground is essential to its stability and rigidity. It is required
to complete this stage in order for your warranty to be valid.

Publicité

Table des Matières
loading

Table des Matières