EN
IMPORTANT
Please read these instructions carefully before you start to assemble this greenhouse.
Keep these instructions in a safe place for future reference.
a Customer Service
For assistance with assembly or for replacement parts – please log onto our website
or call our service line (number is on the title page).
Additional information can be found at our website: www.palramapplications.com
a Safety Advice
•
It is of utmost importance to assemble all of the parts according to the directions.
Do not skip any step.
•
We strongly recommend using work gloves during assembly.
•
Always wear shoes and safety goggles when working with extruded aluminium.
•
If using a step ladder or power tools ensure that you follow the manufacturer's safety
advice.
•
Do not touch overhead power cables with the aluminium profiles.
•
Do not attempt to assemble the greenhouse in windy or wet conditions.
•
Dispose of all plastic bags safely keep them out of reach of small children.
•
Keep children away from the assembly area.
•
Do not lean against or push the greenhouse during construction.
•
Do not position your greenhouse in an area exposed to excessive wind.
•
Do not attempt to assemble this greenhouse if you are tired, have taken drugs or
alcohol or if you are prone to dizzy spell.
•
Hot items such as recently used grills, blowtorches etc. must not be stored in the
greenhouse. Ensure there are no hidden pipes or cables in the ground before
inserting the pegs.
•
This product is designed to use as greenhouse only.
a Care & Maintenance
When your greenhouse needs to be cleaned, use a mild detergent solution and rinse with
cold clean water. DO NOT use acetone, abrasive cleaners or other special detergents to
clean the clear panels. It is recommended to check periodically that
roof panels caps (plastic part 329 & profile 981) are set in place.
a Tools & Equipment
•
Tape measure
•
Work gloves
•
Lubricant
•
Phillips head screwdriver
•
Step ladder
•
Drill bit
•
Large hammer
•
Spanner
•
T001 - Special tool for Screws 411 and nuts 412
a Before Assembly
This is a multi-part assembly best achieved by
two people. Allow at least half a day for assembly
process.
Selecting a site - the greenhouse must be ,
positioned and fixed on a flat level surface.
Choose a sunny position away from overhanging
trees.
We are strongly recomend to fix your greenhouse
directly to a solid concrete foundation. When
doing that use the pre drilled holes in the metal
base supplied.
Take out all components parts of the packages.
Sort the parts and check against the contents
parts list.
During assembly parts should be laid out close at
hand. Keep all small parts (screws etc.) in a bowl
so they do not get lost.
In purpose to facilitate parts' identification and
assembly process, all-positioned profiles are
used in this greenhouse. As a result some
apertures in the profiles are not
used during assembly.
•
Screws 411 and nuts 412 are used throughout the assembly process.
•
Screws 411 are to be assembled from the outside and nuts 412 from the inside of the
greenhouse.
•
If not specified otherwise, do not fasten screws and nuts (411 & 412) more than 2-3 turns
only. Do not tighten them until completion of the panels' assembly.
These 2 icons indicate if screws' tightening is required or not.
•
However, in some steps, temporary tightening of a few screws may be needed to prevent
a profile from falling till it will be fully connected in the next steps.
a During Assembly
Carry out the assembly steps in the order
set out in the instructions.
Step 1: Make sure the base is square by
measuring the diagonals and level by
using a spirit level.
Step 5: Part 7063 is the greenhouse
threshold. Fixing it determines the front
side of the greenhouse.
Steps 8: The oval hole in the crossbars
A256 should always be assembled to the
base of the greenhouse.
Steps 47: Decide on the windows'
location before assembly. Windows
can be installed in two of the indicated
options.
Step 79: Firmly connect the
greenhouse to a level final position
immediately after completion of the
assembly.