Dimensions; Installation - Saba HD600BOX-60 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Dimensions

unit: mm
300
GB
304
306
601
28
All manuals and user guides at all-guides.com
WALL DRILLING AND BRACKET FIXING
286
500
As a first step, proceed with the following lines drawings:
• A vertical line up to the ceiling or up to the upper limit, at the
• A horizontal line A at 950 – 1050 mm above the cooker top�
• A horizontal line B at a 229 mm above the horizontal line A�
• A horizontal line C at a 50-450 mm above the horizontal line

Installation

Vertical reference line
center of the area in which the hood is to be fitted�
B�
GB
29

Publicité

Chapitres

Table des Matières
loading

Table des Matières