Installation Layout; Connecting The Condensation Draining Kit; Installing The Unit On Noise-Damping Supports - Poolex Q-Line 7 Manuel D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1
3.3

Installation layout

Heat pump
Water outlet
Water intake
Elevating
studs
Drain
plug
Valves 1, 2 and 3: Bypass valves
Valves 4 and 5: Regulating valves
(Recommended for facilitating adjustments close to the machine)
Key
3.4

Connecting the condensation draining kit

While operating, the heat pump is subject to condensation. This will result in a more or less large run-off
of water, depending on the degree of humidity. To channel this flow, we recommend that you install the
condensation drainage kit.
How do you install the condensation drainage kit|?
Install the heat pump, raising it at least 10 cm with solid water-resistant pads, then connect the drainage
pipe to the opening located under the pump.
3.5

Installing the unit on noise-damping supports

In order to minimise the noise pollution associated with heat pump vibrations, it can be positioned on
vibration absorbing pads.
To do this, you simply have to position a pad between each of the unit's feet and its support, and then fix
the heat pump to the support with suitable screws.
3. Installation
Valve 5
Valve 4
Condensation
draining
Half-open valve
Automated treatment system
(salt chlorinator, metering pump)
Valve 1
Valve 3
Valve 2
TOWARDS THE POOL
Open valve
13
4-way valve
Circulating
Filtration
pump
FROM THE POOL

Hide quick links:

Publicité

Table des Matières
loading

Table des Matières