Page 1
LARGE TV CEILING MOUNT REDLCM125 Reduce Reuse INSTRUCTION MANUAL Recyle MANUAL DE INSTRUCCIONES MANUEL D’INSTRUCTIONS CAUTION: THE MAXIMUM LOADING WEIGHT IS 125 LBS. USE WITH PRODUCTS HEAVIER THAN THE MAXIMUM WEIGHT INDICATED MAY RESULT IN INSTABILITY AND POSSIBLE PERSONAL INJURY.
QUESTIONS? NEED HELP? PLEASE EMAIL info@redatomproducts.com DISCLAIMER – WARNING INFORMATION Disclaimer –. RED ATOM has extended every effort to ensure to accuracy and completeness of this manual. However, RED ATOM does not claim that the information covers all installation and or operational variables. The information contained in this document is subject to change without notice or obligation of any kind. Regarding the information contained herein, RED ATOM makes no representation of warranty, expressed or implied, and assumes no responsibility for accuracy, sufficiency, or completeness of the information contained in this document.
Page 3
HARDWARE PRODUCT NUMBERS M8 x 30 M6 x 30 M4 x 30 M6 x 15 M8 x 15 M4 x 12 SQUARE SPACER WASHER M8 x 50 ALLEN KEY M5 SET SCREW ALLEN KEY LAG BOLT LAG BOLT 10mm STEEL 2.5mm WASHER 8mm x 65mm...
Page 4
STEP 1- FLAT BACK TV (UNIVERSAL MONITOR PLATE) Connect Universal Monitor Plate to TV Conecte el adaptador al monitor Connectez l'adaptateur au moniteur Square washer STEP 1- CURVED BACK TV (UNIVERSAL MONITOR PLATE) Connect Universal Monitor Plate to TV Conecte el adaptador al monitor Connectez l'adaptateur au moniteur Spacers can also be used to provide clearance for cables...
Page 5
STEP 1- USE M8 STEEL WASHER IF THE PHILLIPS SCREWS FROM THE MONITOR KIT ARE TOO LONG Diagrams show three options for using additional washers if hardware screws are too long to properly tighten into back of TV. select the proper spacers or spacer suit as below if necessary...
Page 6
STEP 1- CENTER UNIVERSAL MONITOR PLATE Monitor Plate must be centered (horizontal plane) on back of TV Secure vertical rails to horizontal chrome rod on Monitor Plate with pre-installed screws.
Page 8
STEP 3- WOOD STUD INSTALLATION Wood Pilot Pilot Hole Size Pilot Drill Depth 7/32” inch 2.75 inch 5.5 mm 70 mm...
Page 9
STEP 4- ATTACH THE PIPE ASSEMBLY AT THE CEILING PLATE. M5 Set Screw Allen Key 2.5mm Adjust the pipe assembly to Rotate the pipe assembly to the best direction , then tighten the ceiling plate, assemble the the set screw with the security two parts.
Page 10
STEP 5- LIFT AND HANG THE MONITOR PLATE AT THE PIPE ASSEMBLY. Secure Acorn Nut and Washer on a) Rotate handle clockwise as far as Monitor Plate to Pipe possible. Assemble (snug b) Pull handle to side laterally tension only) (against spring tension) and rotate counter-clockwise as far as possible.
WARRANTY INFORMATION This warranty applies to US Residents who purchase from an authorized RED ATOM Dealer. RED ATOM products are covered against defects in materials and workmanship for 5 years. RED ATOM will repair or replace the defective component or product, at its sole discretion. Failure to follow product care instructions from RED ATOM will result in void of warranty.