Transport, storage and packaging
3.1
General transport instructions
Check on delivery for completeness and transport damage.
Proceed as follows in the event of visible damage:
Do not accept delivery or only accept with reservations.
Record any transport damage on the transportation documents or on the transport company's
delivery note.
Submit a complaint to the freight forwarder.
IMPORTANT NOTE!
Warranty claims can only be made within the applicable period for complaints.
(More information is available in the T&Cs on the Kampmann website)
IMPORTANT NOTE!
2 people are needed to transport the unit. Wear personal protective clothing
when transporting the unit. Only lift the unit on both sides and not by the pipes /
valves.
IMPORTANT NOTE!
Material damage caused by incorrect transport!
Units being transported can drop or topple over if transported wrongly. This can
cause serious material damage.
Proceed carefully when unloading the equipment on delivery and when
transporting it on site and note the symbols and instructions on the pack-
aging.
Only use the holding points provided.
Only remove packaging shortly before assembling the unit.
4
Installation and wiring
4.1
Requirements governing the installation site
Only install and assemble the unit if the following conditions are met:
Make sure that the wall/ceiling is sufficiently load-bearing to take the weight of the unit.
Make sure that the unit is securely suspended/standing.
Ensure that the airflow can circulate freely.
Provide for adequate space for floor and return water connections on site.
There is a power supply on site.
4.2
Minimum clearances
Unit heaters can be installed free-standing or suspended from the wall using the wall brackets
supplied or suspended from the ceiling using the ceiling brackets supplied. Installation using ex-
isting wall or ceiling brackets is likewise possible.
A minimum clearance L in accordance with the table below must be respected between unit suc-
tion area and wall/ceiling! If you do not leave this minimum clearance, the air heater output will
be reduced and the noise level will increase.
Be sure to observe the minimum clearances when using accessories or for maintenance pur-
poses!
L min
Minimum clearances TIP
Series
Type
54
54_57
55
55_57
56
56_57
* when using wall brackets, type 3_044
4
Minimum clearance L
Standard clearance L*
min.
160 mm
285 mm
180 mm
285 mm
230 mm
335 mm
4.3
Installation
2 people are needed to install the unit.
CAUTION!
Risk of injury from sharp metal housing!
The inner metal of the casing can have sharp edges.
Wear suitable protective gloves.
IMPORTANT NOTE!
Horizontal installation of units!
When installing the units, ensure that they are completely horizontal to ensure
proper operation.
IMPORTANT NOTE!
Install connections in the de-energised state!
Connections must be installed without tension!
Use a suitable tool to protect terminal nuts from being sheared off and
twisted.
16
5
Pre-commissioning checks
Before initial commissioning, check whether all the necessary conditions have been met so that
the unit can function safely and properly.
Electrical tests
Check whether all lines have been properly laid.
Check whether all lines have the necessary cross-section.
Are all wires connected in accordance with the electric wiring diagrams?
Is the earth wire connected and wired throughout?
Check all external electrical connections and terminal connections are fixed in place and
tighten if necessary.
Water-side checks
Check whether all supply and drainage lines have been properly connected.
Fill pipes and unit with water and bleed.
Check whether all bleed screws are closed.
Check leak tightness (pressure test and visual inspection).
Check whether the parts carrying water have been flushed through.
Check whether any shut-off valves fitted on site are open.
Check whether any electrically actuated shut-off valves have been properly connected.
Check whether all valves and actuators are working properly (note permitted mounting pos-