HALFEN HSC
Mounting positions
Stud heads can be aligned horizontal-
ly or vertically. To ensure installation
of the (male) connecting bars, mini-
mum spacing has to be maintained
(not necessary for monolithic compo-
nents). The engineer's specifi cations
are obligatory.
Variation 1:
anchor-heads aligned in
one plane
Min. distances to ensure installation (male bars)
d
[mm]
HSC
12
16
20
25
The engineers specifi cations (installation position, concrete cover etc.)
have to be observed.
i
© 2017 HALFEN · INST_HSC 10/17 · www.halfen.com
All manuals and user guides at all-guides.com
Vertical anchor-head placement
e
HSC
d
HSC
e
[mm]
HSC
10
20
20
25
c
(Concrete cover)
The concrete cover specifi ed in the
drawing must also be maintained for
the stud heads.
Anchorage in columns:
The stud-heads are positioned
behind the rear longitudinal column
reinforcement.
Welding, even spot welding, can
impair material properties. For that
reason welding and heat application
in the head and thread area is not
allowed.
Other welding, outside of this area
has to be carried out according to
applicable welding regulations and is
the sole responsibility of the
welding-contractor.
Horizontal anchor-head placement
Variation 2:
staggered HSC anchors
– minimized axial distances
a
[mm]
HSC
15
20
25
30
Attached to existing reinforcement,
e. g. by wire fi xing!
Assembly instructions
a
HSC
d
HSC
3