Placement; Supply Line Assembly; Maintenance; Cartridge Replacement - Glacier bay QL068 Manuel De L'utilisateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation (continued)

PLACEMENT

1.
Move the assembled unit to its final location. Final hook up of the supply lines and drain system can now be completed.
2.
Once the sink is in place, use a carpenter's level to check the horizontal and vertical alignment of the utility sink. Adjust the leveling
feet as needed so that the unitlity sink is level and does not wobble .
SUPPLY LINES (NOT INCLUDED)
The supply lines that attach the faucet to the household
water system, are not supplied with this unit . They need to be
purchased separately .
Follow the manufacturers instructions for proper installation of
the supply lines .

Maintenance

CARTRIDGE REPLACEMENT

1 . Turn off the water supply to the faucet at the closest
shut-off valve .
2 . Remove water indicator (7) and screw (8) with a hex key .
3 . Remove the handle (9) .
4 . Unscrew off the cartridge cover (6) .
5 . Remove the gasket (5) .
6 . Pull out the cartridge (4) by hand, make sure part (3) and (2)
are not out .
7 . Insert the new cartridge .
8 . Place the gasket (5) back in its original position .
9 . Screw on the cartridge cover (6) . Do not over tighten .
10 . Place the handle (9) over top and secure the screw (8) with a
hex key, replace the water indicator (7) .
All manuals and user guides at all-guides.com
10
9
8
7
6
5
4
3
2
1

Publicité

Chapitres

Table des Matières
loading

Table des Matières