VIII.Commissioning
▪Checkthattheinverterisgroundedreliably.
▪Checkthattheventilationconditionsurroundingtheinverterisgood.
Notice
▪Checkthatthegridvoltageatthepointofconnectionoftheinverteriswithin
thepermittedrange.
▪CheckthatthesealingplugsinDCconnectorsandthecommunicationcable
glandaresealedtightly.
▪Checkthatgridconnectionregulationsandotherparametersettingsmeet
safetyrequirements.
1. S witch o n A C c ircuit b reaker b etween t he i nverter a nd t he g rid.
2. S witch o n D C s witch.
3. W hen t here i s s ufficient D C p ower a p plied a nd t he g rid c onditions a re m et, t he
i nverter w ill s tart t o o perate a utomatically.
IX.EUDeclarationofConformity
WithinthescopeoftheEUdirectives:
-Electromagneticcompatibility2014/30/EU
(L96/79-106,March29,2014)(EMC)
-Lowvoltagedirective2014/35/EU(L96/357-374,March29,2014)(LVD)
-Radioequipmentdirective2014/53/EU(L153/62-106,May22,2014)(RED)
AISWEINewEnergyTechnology(Jiangsu)Co.,Ltd.confirmsherewiththattheinverters
mentionedinthisdocumentareincompliancewiththefundamentalrequirementsand
otherrelevantprovisionsoftheabovementioneddirectives.
TheentireEUDeclarationofConformitycanbefoundatwww.aiswei-tech.com.
6