Step 5
• Install the bucket (purchased separately). Align the bucket
main pivot to the dipper main pivot.
• Position the 6089W250 chain hook (7) with the dipper
main pivot.
• Insert 3011W1170 flanged pin (6) through dipper, chain
hook, and pivot.
• Secure with Z71120 1/4"NC x 2" Hex bolt (11) and Z72211
Hex Locknut (12).
Fig. 6 – Install Bucket
Step 6
• Install bucket tilt linkage. Fit the bucket link into the
secondary bucket pivot.
• Insert a 3011W109 1.0" x 7.45" Flanged Pin (2) through
secondary pivot and 3011W103 Middle Linkage (5).
Secure with Z71120 1/4"NC x 2" Hex bolt (11) and Z72211
Hex Locknut (12).
• Fit the 3011W102 Linkage Arms (4) to the secondary
dipper pivot, then insert 3011W170 1.0" x 7.45" Flanged
Pin (6) through secondary dipper pivot and link arms.
Secure with Z71120 1/4"NC x 2" Hex bolt (11) and Z72211
Hex Locknut (12).
• Align the cylinder rod end bushing, the two linkage arms,
and the bucket linkage. Insert a 3011W170 1.0" x 7.45"
Flanged Pin (6), and secure with Z71120 1/4"NC x 2" Hex
bolt (11) and Z72211 Hex Locknut (12).
11
12
6
7
6
BA201
11
12
Fig. 7 – Installing Tilt Linkage
Step 7
• Connect the hydraulic hoses. Each hose is color-coded
to match the quick disconnects on the dipper boom, e.g.,
red to red, white/red to white/red. Connect each hose to its
appropriate color tag.
Hoses with blue tags are not used on the
backhoe installation.
9
10
Fig. 8 – Quick-disconnect Hoses
• Reinstall the hose clamps on the side of the dipper boom.
4
6
2
5