Harrie Leenders Pharos Interior Instructions D'utilisation page 22

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

1. Preparation
• Have a hole of Ø 280 mm drilled by a concrete driller.
• Allow for the minimum distance (X) from any flammable materials
(see: "General instructions and regulations".)
3. Under roof slope
20 GB
Nut M8 (4x)
Pipe with
ring plate
Indication mark on the backside
2. Installing the ceiling-floor support plate
• Cut the four threaded rods included in the delivery to the proper length,
long enough to be put through the ceiling and fitted.
• Fix the ceiling-floor support plate and the pipe with ring plate
in the manner as shown in the picture.
• Keep the indication mark (provided on both plates) at the rear of the stove.
Stove-pipe
flange
Ball-holding ring
Balls
Bearingplate
Mounting-ring
4. Preparing the stove pipe
• Grease inside of bearing plate sufficiently for balls (using grease supplied
with stove).
• Place the ball-holding ring into the bearing plate and add the 16 balls.
• Slip this assembly on the stove pipe so that the flange of the stove pipe
rests on the balls; this fits one way only. (Turn until the three screws fit
into the recess).
• Push the mounting ring against the bearing plate and fasten it
with the 3 M8x20 bolts (socket or open-end spanner j.w. 13).
• Note: Place the mounting ring so that the long hexagon-head bolts
(M8 x120) are at the lower part and the three short screws (M8 x20)
at the upper part of the ring.
Nut M8 (4x)
Bodywork-ring M8 (4x)
Ceiling-floor support plate
Treaded rod M8 (4x)

Publicité

Table des Matières
loading

Table des Matières