ASSEMBLY OF STRUCTURES (CONT'D)
4.
g)
Repeat this operation until last arch is installed with the door rail on the inside.
h)
Repeat step e) on the last arches.
i)
Add the rest of the male braces (10-367).
j)
Make sure your shelter is at square position with a 90º angle front to back & bottom to top.
Make sure the base is open to the shelter's width, measured from the exterior of the
k)
pipes, in front and back (AC, BD)
l)
Verify that diagonal distances AD and BC are equal, and lengths AB and CD are equal.
COVER INSTALLTION
5.
a)
Place cover in front of the completed structure as shown in Fig. 5.
b)
Unfold the cover as shown and place it onto the structure.
c)
The front of the shelter is the side with windows (1 on the left. 1 on
the right, if included).
d)
Assemble roof on the structure making sure that the triangular corner
is at the front.
e)
Attach all straps around the structure pipes, going all the
way around the garage. Grommets are placed in the upper
corner of each door. Put the remaining cord
grommets and secure to the ground with nails.
f)
Tie inside ties firmly to bars.
DOOR ASSEMBLY
6)
a)
Take one door and place onto it the shower hooks (01-357) (see fig. 7).
Pass the elastic through the grommet hole and take one "S" hook and put
b)
it over the elastic.
Squeeze one end tight (with pliers) over the elastic. Repeat steps (a) to (b) for the other door.
ANCHORING GARAGE
7)
a)
Place your garage in the final position you want then close the front
and back doors (if supplied). Anchor in place with brackets
(90-013) and nails (90-012) as per fig. 9.
b)
Fix flap to your house (if applicable).
CM SCOC 20' ADL 5FT SECT ZZZ-213 MAS-HL.doc
(Ties are always on the inside)
through these
ZZZ-213-MAS-HL
A
B
Fig 5
Fig 7
Fig 8
Fig 9
6
C
D