INSTALLATEUR QUALIFIÉ POUR ACCOMPLIR CE
RÉCHAUFFEUR DE TUBE COMMISSION LE RAPPORT
TYPE OF GAS:
DOES BUILDING HAVE A NEGATIVE CONDITION:
IF THIS IS A HIGH ALTITUDE AREA WHAT IS THE ALTITUDE ABOVE SEA LEVEL
DOES APPLICATION REQUIRE FRESH AIR TO BURNER
IS HEATER EXPOSED TO CHEMICAL OR CORROSIVE ATMOSPHERE:
ARE ACTUAL MINIMUM CLEARANCES AS PER TABLE 3
CAN HEATER BE AFFECTED BY OVERHEAD CRANES / VIBRATION
ARE GAS SUPPLY LINES ADEQUATELY SIZED FOR SYSTEM
GAS LINES AND BRANCHES HAVE BEEN PURGED OF AIR:
THIS HEATER FIRED WITHOUT ANY MALFUNCTION:
INLET GAS SUPPLY PRESSURE WITH HEATER OPERATING :
GAS VALVE OUTLET (Manifold) PRESSURE WITH HEATER OPERATING:
WHAT IS THE LINE VOLTAGE READING AT THE HEATER
WHAT IS THE VOLTAGE READING AT THE IGNITION MODULE
WHAT IS THE FLAME SIGNAL STRENGTH IN uA FROM SENSOR:
IS HEATER CONTROLLED BY A THERMOSTAT
IS THE THERMOSTAT STRATEGICALY LOCATED
WHAT IS TOTAL LENGTH OF INSTALLED THERMOSTAT WIRE
WHAT IS THE GAUGE OF THE THERMOSTAT WIRE
WHAT IS THE HEATER TUBE LENGTH
WHAT IS THE TOTAL LENGTH OF THE VENT (add 10ft for each bend)
WHAT LENGTH IS COMBUSTION AIR INTAKE (add 10ft for each bend)
IF REQUIRED....WHAT IS THE LENGTH OF THE TURBULATOR(S)
IF INSTALLED....IS TURBULATOR AT FLUE END OF SYSTEM
SIGNES DE HAUTEUR D'EMPILEMENT MAXIMUM -
SIGNALÉS AUX THERMOSTATS
CE RÉCHAUFFEUR DOIT ÊTRE ÉLECTRIQUEMENT GOUNDED
RAPPORT RÉALISÉ PAR FAX AUX SERVICES TECHNIQUES:
STW-JZ / IW I&O Manual
IM101229
RL: 12A- BA
RD: DEC 2010
(10ft per Tube section)
1-866-361-0523
FAX
42
NG
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
1-877-446-3727
, VOIX
LP
NO
Feet
Ft
NO
NO
NO
NO
NO
NO
NO
WC"
WC"
VOLTS
VOLTS
uA (microamps)
NO
NO
FEET
GAUGE
FEET
FEET
FEET
FEET
NO