List of Materials
Parts supplied
Removing the packaging
CAUTION!
Remove carton carefully, Wear gloves to protect against
sharp edges.
WARNING!
Remove the protective film covering the product before
putting into operation.
•
Hood structure assembly with blower, transition.
•
4 Lamps already installed.
•
3 Grease filter
•
4 Duct covers.
•
Hardware bag with:
•
Ceiling Mount Template
•
Use, care and installation guide
•
Wood screws (4 pieces - 3/16" x 1" 3/4)
•
Assembly screws (71 pieces)
•
Duct cover brackets (4 each)
•
8 Vertical supports.
•
2 Upper Ductcover supports.
•
2 Horizontal supports.
•
2 Torx Adapters.
Parts not supplied
Optional Accessories
•
Ductless Recirculating Kit
To be used only in the Ductless (Recirculating)
version includes: charcoal filter, charcoal filter support
and fixing bracket, deflector
Tools/Materials required
•
Wire nuts
•
Tape to mount template
•
8" rounded metal duct length to suit installation
•
Measuring tape
•
Pliers
•
Gloves
•
Knife
•
Safety glasses
•
Electric drill with 5/16" and 3/8" Bits
•
Strain relief
•
Spirit level
•
Duct tape
•
Screwdrivers:
•
Phillips (Posidrive) # 2
•
Wire cutter/stripper
•
Masking tape
•
Hammer
•
Saw, jig saw or reciprocating saw
Horizontal support (sup)
Vertical support
Horizontal support (inf)
Vertical duct cover supports
Vertical support (inf)
5