Preparation
• The main unit should be
installed in the center of roof,
it is recommended to have a
min 100mm space around the
top unit.
• Before installing please verify
there is suitable space in the
ceiling to accept the plenum.
• The
installation
(400x400mm)
skylight, solar panels, roof
vents, heaters, lights and all
electrical connections.
position
should
avoid
Installation guide
8