A SS EMB LY IN STR U C T I ON S • I NS T RU CTI ON S D E M O NTAG E • I NS TR U C CI O NE S D E MO NT AJ E
AS SE MB LY IN STR UC TI O NS • IN S TRU CT IO NS D E MO NT AG E • I NST R U CC I O NE S D E M O NT AJ E
Step 1
Étape 1
Paso 1
CC.55mm Bolt x6
Boulon 55mm
Perno 55mm
Attach Bottom Front Rail (Part T), Bottom Back Rail (Part D), Top Front Rail (Part E),
Rail
(Part H) and Top Back Rail (Part F) to
(6)
Crescent Washer
M4 Ballend Screwdriver and M4 Allen wrench, following the instructions on pages 14 and
15.
Fixer le
Barre avant inférieur
avant (Pièce E),
gauche
(Pièce B) à l'aide de (6) boulons de 55 mm (Pièce CC), (6)
(Pièce BB) et (10)
sphériqueet la clé Allen M4
Fije la
Barra frontal inferior
(Pieza E),
Barra de la gaveta
do
(Pieza B) utilizando (6) Pernos 55mm (Pieza CC), (6)
BB) y (10)
Pasadors 25mm
la llave Allen M4 siguiendo las instrucciones de laspáginas 14 y 15.
16
FF. M6x25mm Wood Dowel x10
Cheville en Bois M6x25mm
Pasador de Madera M6x25mm
(Part BB) and (10) 25mm
(Pièce T),
Barre de tiroir
(Pièce H) et Barre Supérieur Arrière (Pièce F) au
Chevilles 25mm
(Pièce FF)
ensuivant les instructions pages 14 et 15.
(Pieza T),
(Pieza H) y Barra Posterior Superior (Pieza F) al
(Pieza FF)
Left Side
(Part B) using (6) 55mm bolts (Part CC),
Dowels (Part
Barre arrière inférieur
à l'aide de dutournevis M4 à tête
Barra trasero inferior
utilizando el destornillador M4 con cabeza de bola y
BB. Crescent Washer x6
Rondelle en croissant
Arandela de media luna
FF).
Tighten the Bolts with the
(Pièce D), Barre Supérieur
Rondelle en croissant
(Pieza D), Barra Frontal Superior
Arandela de media luna
Drawer
Côté
Lado izquier-
(Pieza