Télécharger Imprimer la page

Global 641164 Manuel De L'utilisateur page 3

Sèche-mains automatique haute vitesse

Publicité

Les langues disponibles

Les langues disponibles

L
N
READ COMPLETELY BEFORE STARTING INSTALLATION
PROCEDURE
1. Make sure power supply breaker is switched off. Installation
must be carried out in accordance with the current edition
of the local wiring regulations code. Installation should be
performed only by a licensed electrician.
2. It is recommended to leave a 3.5" clearance at both
sides, 1" clearance above the unit and 15" clearance
below the unit.
3. Dryer should be connected to an individual circuit
breaker rated at 15 Amp.
4. The power supply wire should be at least 16 AWG
NOTE: For two or more dryers, units should be no closer
than 24 inches on center. Do not install dryer over washbasin.
*ADA compliant
High Velocity Automatic Hand Dryer
Fuse
Motor
CONTENTS
Part Qty.
1
1
Hand Dryer
2
4
#9 x 1" Lg. Self Tapping
Phillips Screw
3
4
Plastic Anchor
4
1
4mm Hex Key
Temperature
Switches
Heater
Thermal Fuse
Description
RECOMMENDED
MOUNTING HEIGHTS
From bottom edge of dryer above finished floor
Men
Women
Teenagers
Small Children
*Handicapped
Over countertop
3
User's Manual
Indicator
Temperature
Probe
Sensing
Probe
45"
43"
41"
35"
34"
15" minimum from
countertop

Publicité

loading