Assembly And Operation; Prior To Operation - Freud FT1700VCE Notice Technique

Toupie 2-1/4 hp
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ASSEMBLY & OPERATION

PRIOR TO OPERATION

1. Check Power Supply
Ensure that the power source to be utilized conforms to the power source requirements
specified on the tool nameplate. Ensure the receptacle being used accepts the plug tightly. If
a faulty receptacle is used, it may cause overheating, resulting in a serious hazard.
2. Check Work Area
Confirm that the work site is placed under appropriate conditions conforming to precautions
prescribed in the safety section of this manual.
3. Before Plugging in the Tool
Ensure that the power tool switch (D) is in the OFF position to prevent the tool from accidental
start up which could cause serious injury.
INSTALLING AND REMOVING THE BIT (2 OPTIONS)
WARNING: Disconnect tool from power source. Make sure the correct collet is selected to
match the bit shank diameter before proceeding.
Option 1 – Hand Held Use
a) Open base clamp (O) on the router base (H). - Fig 1a
b) While pressing the router base release button (M), push down the router handles until the
entire collet extends past the base. Rotate Locking Lever (R) until it engages the Spindle
Lock (N) - Fig 1b
Fig. 1a
English
1
9
Fig. 1b
2
3

Publicité

Table des Matières
loading

Produits Connexes pour Freud FT1700VCE

Ce manuel est également adapté pour:

Ft1700vcek

Table des Matières