Charging process (see fig. 5-6)
• Centre the reverse switch 8�
• Press the battery lock 3 and remove the battery 2
(see fig. 5.1, 6.1).
[ABS-12 L, ABS-14,4 L]
Warning! Do not work under the charging
status!
• Connect the power unit 15 to the power supply�
• Insert plug of the power unit 15 in socket of the bat-
tery 2 (see fig. 5.2).
• Disconnect the power unit 15 from the battery 2 and
mount battery 2 in the power tool�
• Disconnect the power unit 15 from power supply�
[ABS-18 L]
• Insert battery 2 into charger 16 (see fig. 6.2).
• Connect the charger 16 to the power supply�
• Disconnect the charger 16 from power supply after
charging�
• Remove the battery 2 from the charger 16 and
mount battery 2 in the power tool (see fig. 6.3).
Charger indicators (see fig. 5, 7)
[ABS-12 L, ABS-14,4 L]
Indicators 10 (of the battery 2) and indicator 19 (of the
power unit 15) inform about charging process of the
battery 2 (see fig. 5).
• Indicator 19 lights green, power unit 15 is not con-
nected to the battery 2 - power unit 15 is connected to
the power network (ready for charging)�
• Indicator 19 lights red, power unit 15 is connected to
the battery 2, indicators 10 lights red (one by one) - the
battery 2 is being charged�
• Indicator 19 lights green, power unit 15 is connected
to the battery 2, all indicators 10 lights red - the bat-
tery 2 is fully charged� Some time later indicators 10
will be turns off to save energy�
• Indicator 19 lights green, power unit 15 is connected
to the battery 2, indicators 10 not lights - the charging
process of the battery 2 is terminated because of its
failure� Replace the faulty battery 2, its further use is
prohibited�
[ABS-18 L]
Charger indicators 20 and 21 inform of the battery 2
charging process� Signals of the indicators 20 and 21
are shown on the label 22 (see fig. 7.1-7.3).
• Fig� 7�1 - (the green indicator 21 is on, the battery 2
is not inserted in the charger 16) - the charger 16 is
connected to the power network (ready for charging)�
• Fig� 7�2 - (the red indicator 20 is on, the battery 2
is inserted in the charger 16) - the battery 2 is being
charged�
• Fig� 7�3 - (the green indicator 21 is on, the battery 2
is inserted in the charger 16) - the battery 2 is fully
charged�
In the process of charging the battery 2
and the charger 16 become hot, it is a
normal process.
Switching the power
Make sure that the reverse switch 8 is not centred,
this blocks on / off switch 7.
Switching on:
Press on / off switch 7.
Switching off:
Release the on / off switch 7�
Battery (see fig. 8)
The battery 2 is protected by the safety system against
deep discharge� In case of complete discharge, the
power tool is automatically switched off� Attention:
do not try to switch on the power tool when the
protection system is activated the battery 2 can be
damaged.
With the push of the button 11 the indicators 10 show
the state of charge of the battery 2 (see fig. 8).
Temperature protection
The temperature protection system enables to auto-
matically deactivate the power tool in case of excess
load or when the temperature of the battery 2 is ex-
ceeding 70°C� The system guarantees protection of
the power tool from damage in case of noncompliance
with the operation conditions�
LED lamp
When the on / off switch 7 is pushed, the LED lamp 4
is automatically switched on that allows to carry out
works in low light conditions�
Torque regulator
Rotate the regulator 5 in order to set one of the 20
torque values most suitable for the work performed�
It is recommended to set the torque
regulator 5 into the position "Drill" to perform
drilling�
Stepless speed adjustment
Speed is controlled from 0 to maximum by
pressing force of on / off switch 7� Weak
pressing results in low revolutions, which
enable a smooth power tool switch-on�
Step speed selector switch
Attention: one can only change the revo-
lutions per minute range after the engine
fully stops.
In order to choose the "1" gear, move the switch 5
back� This mode is used for the fastening of screws or
for large diameter hole drilling�
In order to choose the "2" gear, move the switch 5
forward� This mode is used for speed drilling of small
diameter holes�
English
25
tool on / off
Design features
of the power tool