Scania My 2016 R&S Instruction Pour Le Montage page 13

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

AIR CONDITIONING FOR PORTHOLE
Clean any adhesive or lubricating grease from the cab seal surface as shown in the figure. Place the provided lower gasket in
position, as shown in the figure, ensuring that it adheres properly as indicated by the red arrows in figure 1.
Join the gasket, as shown in figure 2.
Perforate the gasket with a Phillips screwdriver above the 16 holes in the cab roof, as shown in figure 3.
Porthole Air Conditioner Scania My 2016 R&S 04/05/2018
ENGLISH
Figure 1
Figure 2
Figure 3
13

Publicité

Table des Matières
loading

Table des Matières