DD 2G 10.8-EC / PD 2G 10.8-EC
Release unlocking ring. Check that the
attachment is locked in position.
Disassemble
Pull unlocking ring forwards and remove
angle attachment.
Inserting the tools
The angle attachment has a ¼" tool holder.
Screwdriver bits and bit holders are securely
held in the tool holder.
The keyless chuck (see "Changeable drill
chuck BF 10.8-EC") or the bit holder (see "Bit
holder attachment BV 10.8-EC") can be
mounted on the angle attachment.
Bit holder attachment BV 10.8-EC
CAUTION!
Before carrying out any work on the power
tool, move the direction preselector switch (2)
to the middle position.
Assemble
Pull unlocking ring forwards (1.) and press
bit holder attachment all the way onto the
tool holder (2.).
Release unlocking ring. Check that the bit
holder attachment is locked in position.
Disassemble
Pull unlocking ring forwards and remove
bit holder attachment.
Inserting the tools
The bit holder attachment has a ¼" tool
holder. Screw-driver bits are securely held in
the tool holder.
Pull tool lock forwards (1.) and press in
the tool all the way (2.).
Release tool lock.
To remove the tool, pull tool lock
backwards.
21