Flex DD 2G 10.8-EC Notice D'instruction D'origine page 21

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 27
DD 2G 10.8-EC / PD 2G 10.8-EC
 Release unlocking ring. Check that the
attachment is locked in position.
Disassemble
 Pull unlocking ring forwards and remove
angle attachment.
Inserting the tools
The angle attachment has a ¼" tool holder.
Screwdriver bits and bit holders are securely
held in the tool holder.
The keyless chuck (see "Changeable drill
chuck BF 10.8-EC") or the bit holder (see "Bit
holder attachment BV 10.8-EC") can be
mounted on the angle attachment.
Bit holder attachment BV 10.8-EC
CAUTION!
Before carrying out any work on the power
tool, move the direction preselector switch (2)
to the middle position.
Assemble
 Pull unlocking ring forwards (1.) and press
bit holder attachment all the way onto the
tool holder (2.).
 Release unlocking ring. Check that the bit
holder attachment is locked in position.
Disassemble
 Pull unlocking ring forwards and remove
bit holder attachment.
Inserting the tools
The bit holder attachment has a ¼" tool
holder. Screw-driver bits are securely held in
the tool holder.
 Pull tool lock forwards (1.) and press in
the tool all the way (2.).
 Release tool lock.
 To remove the tool, pull tool lock
backwards.
21

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Pd 2g 10.8-ec

Table des Matières