Preparations For Installation; Preparation; Tools And Equipment; Only For Extraction Mode - Ore CH60A - T1B Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Preparations for installation

You will need the following tools and equipment for the installation:

Tools and equipment

-
Phillips screwdriver, size 2
-
Masonry drill Ø = 8 mm
-
Measuring tape/foot rule
-
Spirit level
-
Pencil
-
Stable stepladder
-
Activated carbon filter for circulating air mode
-
Exhaust air hose for extraction mode
-
Wall plugs (6x)
-
Fixing screws (6x)
We recommend asking a second person to assist you with the
Important!
installation. Please observe the order of the installation instructions.
Please note that some parts of the chimney sections may have sharp
Risk of injury!
edges.
The surfaces of your new extraction hood may be covered with films to protect
Remove the protective films
them from being scratched during transport. Only remove the protective films
immediately before final attachment of the extraction hood.
Before installation of the hood, wall breakthrough (core drilling, diameter

Only for extraction mode

dependent on hose diameter) must be carried out by a specialist firm.
During planning of wall breakthrough, pay attention to the length of the exhaust
air hose. The exhaust air hose must be sufficiently long to reach the outside edge
of the wall without any kinks.
If the exhaust air hose is routed through an external wall, the
Important!
air discharge must be covered on the outside using a cover with
automatically opening slots (not in the scope of delivery). For this,
commission the specialist firm that makes the wall breakthrough.
10

Preparation

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ch90a - t1b

Table des Matières