STANO BAIGNOIRES ILOT DESIGNEN ACRYLIQUE Notice De Montage page 5

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

STEPS OF INSTALLATION
1 -
Prepare the site where the bath will be installed. Make sure that the surface where the bathtub will
be placed is perfectly flat, clean, free of any humidity and offers adequate support for this bathtub.
2 -
Position the bath on its final installation location. Adjust the (hidden) feet of the bathtub so that the
bathtub is perfectly stable and leveled.
3 - Install the taps, then connect the siphon to the drain outlet of your bathroom. Strictly respect all
plumbing and building codes and usages.
4 - Then, run water into the bathtub in order to check for potential leaks and to solve them.
5 - At last, apply a silicone joint all around the base of the bathtub. Leave to dry for at least 24 hours.
NOTICE DE MONTAGE
Manual modern baths - 032022 - FR EN SP IT DE
ENGLISH / ANGLAIS
Page 5 / 11

Publicité

Table des Matières
loading

Table des Matières