Wiring Cegard/Mini In Combination; Power-Up And Test For Proper Function - Cedes UPS Plus Manuel D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Universal Power Supply Plus (UPS Plus)
6.5
Wiring cegard/Mini in combination with IMS 100
Follow the wiring diagram (Figure 4) to connect e.g a cegard/Mini in combination with a IMS100 to the elevator
controller. For the functional description of the cegard/Mini light curtain and the IMS 100 please refer to the manuals
on www.cedes.com.
Power
LED
Green
ON
ON
Power OK
OFF
OFF
No power
Sensor connection
Test
V V
V V
black
blue
brown
white
*
* Time-out selector connection (white wire) has to be connected (depending on the requested time-out setting)
Time-out setting
Connect the white wire from IMS 100 to 24 VDC for 18 s **
Connect the white wire from IMS100 to GND (0 V) for Infinity
For more details refer to the IMS 100 manual on www.cedes.com
** The timer begins to count after the first sensor triggering. After this time the sensor will be disabled until the
Emitter
Receiver
Figure 4:
Wiring of the UPS Plus with the cegard/Mini light curtain in combination with the IMS 100 3D sensor
6.6

Power-up and test for proper function

Turn on power after the sensor has been correctly installed
in conjunction with the UPS Plus. The start-up time for the
UPS Plus takes max. 4 s.
The green LED in the UPS Plus indicates that there is supply
voltage available.
An orange LED indicates the status of the sensor input 1
and the output relay 1.
A red LED indicates the status of the sensor input 2 and
the output relay 2.
© CEDES | V 1.0
Input 1
Input 2
Orange
Red
Output
Power
relay 2
V
V
V V
V
V V
V V
V
IMS 100
next door opening.
UPS Plus LED definition:
Outputs
- Power LED (green) is ON, if supply voltage is connected correctly.
-
- Input LED (orange) is ON, if the protected area is obstructed.
- Input LED (red) is ON, if the protected area is obstructed.
Buzzer definition:
- Buzzer is OFF, if the protected area (light curtain) is not obstructed.
Output
- The buzzer can be turned on/off by using a switch.
relay 1
Relay definition:
In the configuration shown, the relay is energized if there is
V
V V
voltage applied and there is no obstruction. Contact between
COM and NO (safest connection).
NO
L
N
Protective
ground
COM
Orange LED
ON
OFF
Red LED
ON
OFF
Output relay 1
Supply voltage:
To the
20 ... 265 VAC
elevator controller
20 ... 375 VDC
Output relay 2
Sensor input 1
Output relay 1
LOW
COM = NC
HIGH
COM = NO
Sensor input 2
Output relay 2
LOW
COM = NC
HIGH
COM = NO
English
7

Publicité

Table des Matières
loading

Table des Matières