Application Information - Aircast Cryo/Cuff IC Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

APPLICATION INFORmATION

EN
A P P L I C A T I O N I N F O R m A T I O N
1. B e for e a ppl y i ng t h e Cr yo/Cuf f,
p repare the coo l e r ( Fi gur e 1 )
Connect the blue tube to cooler.
Add cold water to line inside cooler.
Fill with ice.
Lay insulation disk on top of ice. Attach cooler lid snugly.
Allow five minutes with occasional shaking to chill water.
2 . A lw ays ap pl y EM PT Y C r y o/Cuff
( Figure 2)
Use only Aircast Cryo/Cuffs and ArcticFlow Cuffs with
Aircast Cryo/Cuff IC Unit. Cuff is the Applied Part.
Carefully and completely read instructions supplied with
the specific Cryo/Cuff prior to application. Please follow
the instructions below to continue cooler preparation.
3. F i ll an d pr ess ur i ze C r y o /Cuff
( Figure 3)
To fill cuff: Connect blue tube to the cuff. Raise cooler no
more than 15" (38cm) above the cuff for approximately 30
seconds while Cryo/Cuff fills.
To correctly position cooler: Place cooler on stable surface.
The cooler base should be even with the cuff.
NOTE: To AVOID excessive pressure during use, DO NOT
raise the cooler higher than 15" (38 cm) above the Cryo/
Cuff.
To turn cooler on: Plug power supply into wall outlet and
connect cord to lid.
To turn off the equipment disconnect the power supply.
To refill cooler: When Ice has melted , unplug the cooler
and repeat items 1-5 under Step 1.
For specific cuffs, please refer to instructions for
installation of each cuff and follow procedure above.
4
Figure 1
Figure 2
Figure 3

Publicité

Table des Matières
loading

Table des Matières