LA NORDICA KIT WIND AIR Mode D'emploi page 29

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

.
THIS OPERATION MUST ALWAYS BE PERFORMED IN
THE ABSENCE OF ELECTRICAL POWER SUPPLY !!
-.extract.the.electrical.wiring.from.the.vent;
-.bring.the.motor.group.close.to.the.vent;
-.connect.the.electrical.wiring.A.for.motor.operation;
-. connect. the. electrical. wiring. B . to. operate. the. temperature.
probe;
The temperature probe and the fans are provided with a 2.5
meter electric wire made of silicone material to withstand
high temperatures; higher distances require the creation of
an extension by the installer!
-.insert.the.motor.group.inside.the.vent,.supporting.the.corner.of.
the.plate.fixed.on.the.motor.with.the.internal.edge.of.the.vent;
-. use. the. 4. screws. supplied. and. secure. the. motor. group. to. the.
structure.fixed.on.the.vent;
-.secure.the.ducting.pipes.A.to.the.galvanised.fittings.B.using.the.
supplied.hose.clamps.C;
Each pipe must NOT EXCEED 8 meters for forced ventilation,
it must be insulated with insulating materials to avoid noise
and heat dispersion.
The lengths of the ducting pipes should be possibly of equal
length to avoid varying amounts of air and heat distributed
by each outlet.
.IMPORTANT the motor group must remain oriented
as shown in the figure; positions other than the one
shown are not permitted.
C
ENGLISH
A
B
B
A
29

Publicité

Table des Matières
loading

Table des Matières