England's Stove Works CUB Guide D'installation Et D'utilisation page 11

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Pipe: Inspect the flue system to be sure it is properly intact. Inspect the pipe and spark arrestor, 
rain cap, etc. for creosote buildup, and clean if necessary.   
Door and Gasket: Check the door handle for proper operation and to be certain a tight seal is 
being made by the door.   
Your stove has a fiberglass gasket installed around the door opening.  Check this to be sure it is 
fully intact and is in good condition. If the gasket needs to be replaced, you may purchase 
replacement gasket from England's Stove Works (Part # AC‐DGKCS). 
Other: Visually inspect any other parts (including accessories, options, etc.) for proper function. 
Finish: This new unit has been painted at the factory with a high‐temperature paint that should 
retain its original look for a long time.  If rust spots appear, the spots can be sanded with fine 
steel wool and repainted. It is crucial that you use only high‐temperature spray paint (our 
proprietary paint is Part # AC‐MBSP), as others may not adhere to the surface or withstand the 
high temperatures. 
 
 
 
Thanks again for purchasing this stove from England's Stove Works!
 
 
If you should have any questions or need any help with your unit, please contact Technical 
Support at (800) 245‐6489. 
 
 
 
 
Page | 11

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

BlackbearGrizzly12-css12-csm12-csl

Table des Matières