Télécharger Imprimer la page

Ancona Prima Mode D'emploi page 2

Publicité

Les langues disponibles

Les langues disponibles

Installation Size Map
Single Hole Installation
Step 1: Preparation: Turn off water supplies and drain water lines. Clean installation site and
remove any debris from the area.
Step 2: Connect Supply Hoses: A. Screw supply hoses (2) and (3) into base of faucet
body (1).
B. Screw in steel post (4) into base of faucet body (1).
Step 3: Secure Spout Body (1) in place:
C. Insert black rubber ring (5b) into the metal ring (5a).
D. Insert the metal ring (5a) in between bottom of
E. Insert faucet body (1) through sink deck hole.
Step 4: Insert Rubber and Metal washers:
1
Sink Deck
5a
5b
4
6
3
7
2
8
faucet body (1) and sink deck hole.
F. Slide black rubber washer (6) and metal
washer (7) over steel post (4), so that they
fit around supply hoses (2 & 3).
G. Insert nut (8) onto steel post (4).
Step 5: Securing all connections:
H: Connect supply hoses to main water supply.
I: Ensure all connections are tight to avoid
potential leakage.
Three Hole Installation
Test Faucet Installation
A. Move handle into "OFF" position.
B. Turn on water supplies. Check connections for leaks.
C. Remove
aerator
one minute. This will help clean any debris that might
otherwise clog the system. Replace aerator.
D. Operate handle up and down, in cold and hot positions,
o t
f
u l
s
h
w
t a
Simply rinse the surface with clear water or
mild liquid detergents if necessary Dry the
Maintenance:
faucet with a clean soft cotton cloth Do not
use any cleaning agents containing
acids polish abrasives or harsh cleaners
Step 1: Insert plate (1) and metal ring
with rubber washer (2 & 3)
before inserting spout body
into sink deck.
Step 2: Repeat steps 1 to 4 from
Single Hole Installation.
Step 3: Secure plate (1).
Step 4: Securing all connectors:
Ensure all connections are
tightly set in place to avoid
leakage.
and let both hot and cold water run for
r e
n i l
e
s
h t
o
o r
u
g
. y l
h

Publicité

loading