OTC 1595A Mode D'emploi Et Liste Des Pièces page 7

Outil de levage pour groupe motopropulseur
Masquer les pouces Voir aussi pour 1595A:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Parts List & Operating Instructions
Removal
1. Follow the vehicle manufacturer's recommended service procedure for removal of the component.
2. Position the Power Train Lift under the vehicle.
3. Raise the Power Train Lift to the load.
4. Adjust the wood blocks to fit the assembly, and tighten the nuts to secure the blocks in place.
5. Turn the adjusting screws (items 34 and 43) to align the lift with the component. Raise the lift to the correct
position.
6. Place the strap assembly around the component, and tighten the strap securely to the hook holes.
7. Remove any remaining bolts from the vehicle component.
8. Lower the Power Train Lift and the vehicle component until the Lift is completely collapsed.
9. Move the Lift and load out from under the vehicle.
Installation
1. Position the Power Train Lift under the chassis.
2. Raise the Power Train Lift and turn the adjusting screws to align the component in the correct position.
3. Follow the vehicle manufacturer's recommended service procedure for installing the component.
Use a good grade lubricant to regularly lubricate the pivot points, the adjusting screws, and the swivel casters.
This document contains product parts lists, and information
regarding operation and maintenance. Items listed in the
parts list have been carefully tested and selected by OTC.
Therefore: Use only OTC replacement parts.
Product questions can be directed to the OTC Technical
Service Department at (800) 533-6127.
© Bosch Automotive Service Solutions Inc.
Operating Instructions
Maintenance
Form No. SP04506662
Get parts at
OTCparts.com
Sheet No.
4 of 4
Issue Date:
Rev A, January 29, 2019

Publicité

Table des Matières
loading

Table des Matières