Water Priming - Yamaha YP20T Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

NOTICE
Install the strainer
50 mm (2 in) suction port diameter for YP20T with
filtering perforations 20 mm (0.78 in) or less in
diameter.

Water priming

Make sure the water is at pump casing upper level.
Add water as necessary.
1 Upper level
1
NOTICE
Be sure the pump is filled up with water before
starting the engine or mechanical seal damage will
occur.
TIP
9 Place the water pump on a secure, flat and level
surface as near to the water to be pumped as pos-
sible.
9 The higher the water pump is from the water sur-
face (more suction head), the longer it will take to
prime and the lesser pump output (discharge
head) will be.
– 10 –

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Yp30tYp40t

Table des Matières