Broan XB90LC Guide D'installation page 6

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Page 6
New Construction Installation
6
Insert Mask and
Finish Ceiling
• Install ceiling material.
• Cut out around Housing.
CAUTION
IN ORDER TO PREVENT MOTOR/CONTROL DAMAGE:
If the blower was unplugged, power must be
disconnected (see page 2, WARNING item 2)
before inserting motor plug into control assembly.
7
Install Grille
8
Install Bulbs
1
See Page 12 for Operations, Cleaning and Maintenance, and Troubleshooting.
1
2
2
XB90LC
XB110LC Installation Guide
n
Mask protects unit
during construction.
Remove before
installing Grille.
3
3
4
Night Light
(purchase separately)

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Xb110lc

Table des Matières