Preparation; Assembly Instructions - Kobalt NEXT GENERATION OF TOUGH TOOLS SGY-AIR160TZ Mode D'emploi

45 pièces ensemble de pistolet de pulvérisation
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

PREPARATION

Before beginning the assembly of the product, make sure all parts are present.
Compare parts with package contents list. If any part is missing or damaged, do not
attempt to assemble the product.
Estimated Assembly Time: 5-10 minutes
Tools Required for Assembly: Adjustable wrench (not included)

ASSEMBLY INSTRUCTIONS

Note: The life of this product and the efficiency of its
operation depends upon the knowledge of its
construction, usage and maintenance (See Figure 1;
Not all accessories shown are included, but are
recommended for best performance).
1. Take out spray gun (A1/A2) and put on paint cup
(B1/B2) with hand. Make sure that the paint cup
(B1/B2) is installed with spray gun (A1/A2) tightly
and correctly. (See Figure 2)
2. Connect recoil air hose or air supply hose with
the air inlet (I1/12) of spray gun (A1/A2). Use seal
tape (N) for airtight connection. Do not overtighten.
(See Figure 3).
3. Set the rated working pressure (i.e. 40 PSI for
small gravity spray gun and 45 PSI for siphon
feed spray gun) for best performance.
NOTE
The working pressure refers to the air line
pressure when the spray gun trigge
fully under working conditions.
r
J (
1
J /
) 2
s i
p
u
e l l
d
7
1
Atomization
Pressure Gauge
2
B1
A1
3
I1
Oil and
Water
Extractor
A2
B2
I2

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

0105568

Table des Matières