Laying the connecting pipelines

All supply lines and overflow lines must have a gra-
dient of at least 1 % in the flow direction (possible
down-line settling must be considered).
Prior to completion of the backfilling verify that the
pre-installed overflow bend inside the tank is point-
ing upwards.
If the tank overflow is connected to a public canal
this must be secured against backpressure in ac-
cordance with DIN 1986 by means of a pump station
(combined sewer) or a backflow stopper (pure rain-
water canal).
All intake, pressure and control lines must be led
through an empty conduit installed with a slope to-
wards the tank, without sagging and as well as pos-
sible along a straight line. Pipe elbows required must
be with 30° fittings.
Important: Connect the empty conduit to an open-
ing above the maximum water level.
6.
Cover
Shaft extension
Seal
FLAT flat tank
The shaft extension can be shortened at the grooves. This allows earth coverage from 400 to 780 mm
above the tank shoulder.
To mount the shaft extension
seal supplied
. It is not necessary to attach the extension, as the shaft is held in position by the sur-
rounding soil after filling in the installation pit.
Then set on the cover
cover firmly enough so that a child cannot open them!
5.
Installation and Assembly

Installing the Shaft Extension and Covering

set the extension loosely onto the tank opening
and close off with child protection. Tighten the screw connections on the
info@4rain.eu
www.4rain.eu
19 / 40
and then mount the

Hide quick links:

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

295120295121295122295123295124295125

Table des Matières