May we congratulate you on your new Greenhouse
GB
Dear Customer!
The assembly of your new greenhouse requires no
technical knowledge. However, it is important that
the assembly instructions are strictly followed. The
assembly instruction is a combination of text and
illustrations. The profiles are packed seperatly in
numbered packs corresponding to the order in the
assembly instruction. Erect one pack at a time. All
nuts and bolts and fittings are found in bag No. 0
(specified on page 12). Each pack is specified in
separate lists of components.
All detailed illustrations are marked with symbols:
seen from inside
seen from outside.
Precautions.
•
Assembly must only be carried out in dry and
calm weather.
•
Always use working gloves while glazing.
Greenhouse glass has sharp edges, especially if
the glass breaks.
•
Assistants and especially children must be
warned that broken glass is an element of
danger. Pick up broken glass at once and
remove it with care.
•
We recommend to use protective glasses while
fixing the spring wire clips.
•
Place the ladder on a level support.
•
It is essential to have an assistant.
References
The column marked
indicates the page(s) on
which the component is used.
Page 13:
Foundation
The base is not included in this delivery. However,
an optional base can be bought separately. It ensures
you have a stable and easy to build base.
If you make your own base the measurements
indicated must be external measurements.
If you buy an optional base you furthermore need
about 75 litres of concrete and 6 plastic-/concrete
pipes of about 800 mm which are placed in a non-
freezing depth for the fastening of the corner and
middle anchors.
The base must be 100% level and square; the latter
is ensured by checking that the two diagonal
measurements are equal.
Tools
The mounting of the greenhouse requires the tools
shown on page 12.
Page 13:
(Fastening to the base).
When constructing your own base you have to drill
holes (7 mm) in the ground frame between all the
vertical frames, the greenhouse is then fastened to
the base with screws (A).
Using an optional base the greenhouse is fastened to
each vertical bar as shown on drawing B.
(For the original foundation, use 14205 to support
the bottom door rail externally. See picture C.)
Pages 14–29:
Position the components as shown on the drawing
and assemble in order as illustrated. Do not fully
tighten the nuts until the entire subassembly has
been assembled
Best order of installation:
1) Sides – 2) Roof – 3) Assembling the carcase –
4) Doors – 5) Windows – 6) Polycarbonate – 7) Glass
–
Installing glass/polycarbonate
Important before installation!
Check that the sides are vertical and square, and that
the door(s) and window(s) open and shut properly.
Page 29:
Installing polycarbonate
The general drawings on page 29 show how to install
these parts. The type designation indicates the length
in mm. If necessary, adjust with a fine-toothed saw.
Note: To reduce algae formation, do not let the
polycarbonate sheets touch the ground. Use a piece
of cardboard as a base.
Install mouldings 14250 and 14234 at the bottom of
the polycarbonate sheets as shown on page 29.
Tip:
To improve protection against water ingress, apply
aluminium foil (not included) to the sides and top
of the polycarbonate sheets. Microporous tape (not
included; available from DIY stores) can be applied
to the bottom of the polycarbonate sheets. Then
install 14250 and 14234.
Another solution is to apply silicone sealant (not
included) between the aluminium and polycarbonate
in the roof.
Note: The more tightly sealed the greenhouse is, the
more condensation there is likely to be.
Page 29:
Installing the glazing
Clean the glass and profiles with rubbing alcohol.
Before glazing, fit the packing cord (no. 00411) to all
side bars, as shown on the drawing. Note: Do NOT
use in the roof.
Mount the mouldings as shown on the drawings on
page 28.
Note:
This structure is designed as a greenhouse, and the
design is not intended to be completely waterproof.
If you want to use the greenhouse as an outdoor
space, please be aware that it is not 100% waterproof
and that we cannot be held liable for any damage to
any contents placed inside.
www.hallsgreenhouses.com
Please refer to website for the most up to date instruction
Now your greenhouse is completely assembled.
However, please notice the following:
Maintenance
•
•
•
•
•
Winter Protection
In areas with occurrence of snow we recommend the
following winter protection:
•
•
•
•
•
Insurance
Please note that not all insurance companies cover
greenhouses automatically. Please contact your
insurance company to ensure an insurance coverage.
Guarantee
Juliana grants a guarantee of 12 years which covers
replacement of faulty parts. The guarantee does
not cover polycarbonate, glass, transport, assembly,
freight etc.
Juliana grants a guarantee of 2 years on painted parts,
if any. Note that marks in the painting may occur due
to suspension of the profiles.
The guarantee is invalid if the greenhouse is not
assembled according to these instructions.
Complaints
All our greenhouses are built to high standards of
quality. However, should a complaint occur please
contact your dealer at once. Remember to specify
the defect by indicating the greenhouse model and
number of the component and the quality control
number.
B
USA
Grease doors (hinges and lock or doortrack).
Clean the gutter for leaves, etc.
Adjustment of windows.
Replacement of broken glass.
Clean the greenhouse with disinfectant before
and after the growing season.
Support the roof ridge at the centre of the
greenhouse.
Remove greater snow loads from the roof.
Take precautions against snow falling down
from for instance a tree or a roof.
Dismount the cylinders for the automatic
window openers, if any (optional extras).
Secure door(s) and window(s) preventing wind
damage to the greenhouse.