Flow Housing
(pict.
1)
NO
draining
layer
(pict.
2)
sheath
concrete base
(pict.5)
(pict.
6)
Concord
YES
Fitting features and meaning of the symbols shown
on the label:
refer to the Flow/fixture installation instructions
Installation
for a correct installation please proceed as follows:
• when floor recessed avoid positioning the fixture in
• when it is to be driven over, it is essential to bury
3
• to guarantee a better anchorage to the ground or to
104
(pict.
3)
• the recessed housing level must match the finished
finished floor
• more lined-up boxes can be assembled using the
• use the head blind holes for the passage of the
(pict.
4)
• assemble the shaping cover to avoid deformations of
• after having completed the housing box installation,
fixture fixing holes
Feilo Sylvania Europe LTD
Avis Way, Newhaven East Sussex BN9 0ED UK
www.feilosylvania.com
IS500
areas of subsidence (pict.1) where dirt and stagnant
water can accumulate
the housing box in a suitable block of concrete in
order to avoid subsidence of the ground and lateral
movements, providing a suitable draining layer (pict.2)
concrete open the lateral hooks (pict.6)
floor (pict.4) or wall level (pict.3)
connection holes made on the heads (pict.5)
protective sheaths or enter from the bottom of the box
(pict.5).
the box during the installation and to protect the fixing
holes of the fixture (pict.6)
remove the shaping cover and proceed to the fixture
electrical connection following the instructions enclosed
to it. (pict.7)
Specifications are subject to change without notice!
Quality control: In case of complaint please get in
touch with our company or its sales organization.
Please give the number of your order as well as the
serial number that recognizes the fixture.
IS13171B
230-240V~ 50/60Hz
(pict.
MI/1691 - 4
ed.
a
ISO
14001
Environmental
Management
EM 539002
FM 01687
© Concord Lighting Limited 05.17
7)
ISO
9001
Quality
Management