Installation; Checks; Installing The Perfomaster - Simco-Ion Perfomaster Notice D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5.
Installat
tion
Da
nger:
Install th
he Perfom
-
ELECTR
RODES.
Danger o
of electric
Exposur
re to high
-
-
The Perf
fomaster a
to ensur
re safe and
Wa
arning:
The elec
ctrical inst
-
relevant
training a
Disconn
ect the po
-
No
ote:
-
The Per
rfomaster
It is reco
ommende
-
This is p
particularl
attach a
another sh
5.1

1. Checks

s
-
Check th
at the equ
-
Check th
at the deta
-
Check th
at there is
connectio
on cable ca
See spar
re parts list
If you hav
ve any prob
in your reg
gion.
5.2
2. Installin
ng the Per
Ins
stall the Pe
erfomaster
o In the
e location w
o At a s
stable locat
suppli
ied
o With t
the electro
mach
ine can be
electr
rode(s) and
o In suc
ch a way th
Perfom
master is i
o Prefer
rably in su
disma
antle the en
Per
rfomaster_UM_
_9752093220_N
aster in su
uch a way
y that it is
c shock
voltages c
can be da
angerous f
and the po
ower unit
d proper o
operation
tallation m
must be ca
arried out
and qualifi
ications
ower supp
ply before
does not
work with
h electrica
ed to switc
ch the Per
rfomaster
ly importa
ant if peop
ple have a
heet, for in
nstance
ipment is u
undamage
ed and that
ails on the
packing sl
a connect
tion cable w
an be obta
ained from
t on page 4
43
blems and/
/or doubts,
rfomaster
r:
where you w
want it to p
perform pe
tion on the
e machine,
de(s) oppo
osite an ea
arthed coun
e used for t
this purpos
se. For opt
d the count
ter electrod
hat the elec
ctrodes ca
annot be to
n operatio
n
ch a way t
that the ele
ectrode hea
ntire Perfo
master (se
ee 8.2 Rep
NL_D_GB_F_V1
_6
NOT POS
SSIBLE TO
for people
e with pace
must be p
properly e
arthed. Ea
and to pre
event elec
ctric shock
by an elec
ctrical eng
carrying o
out work o
on the uni
lly conduc
ctive webs
on and of
ff via the m
ccess to t
the Perfom
t you have
received t
ip corresp
ond to the
details of t
with a 5-po
ole M12 co
onnector (fe
Simco-Ion
n Netherlan
nds or the a
, please co
ontact Sim
co-Ion Net
erforation d
detection
using the
nylon bolts
s, and the
nter electro
ode; an ea
timal opera
ation, the d
de must be
e no more
than 5 mm
uched by o
operating s
ad can be
removed w
placing the
electrode
O TOUCH T
THE
emakers
arthing is
necessary
y
ks upon c
contact
gineer with
h the
it
s
machine.
master in o
order to
the correct
version
the produc
ct received
d
emale). A
standard
agent in yo
our region.
.
therlands o
or the agen
nt
nuts and r
rings
arthed rolle
er in the
distance be
etween the
e
m
staff when
the
without hav
ving to
head)
GB
35

Publicité

Table des Matières
loading

Table des Matières