Chapter 3
DANGER
All operations described in this chapter
shall be carried out by skilled and author-
ized technicians, only.
3.1 - UNIT LIFTING (Fig. 1)
Lift the unit through a suitable device, such as a crane
or an hoist, complying with the following instructions:
Unscrew the screws (1) and remove the top covering
that blocks the stones (2). (Fig.1)
Remove the first stone (3) and do the same with
the other stones counterclockwise, until you have
removed them all. (Fig.2)
Hook 4 ropes to the eyebolts (4) on the oven and the
orher end to the forks of the forklift adjusted according
to the weight of the oven.
Lift the oven making sure it is balanced. (Fig. 3)
EN - 12
FIG. 1
1
2
FIG. 2
3
DOME
Installation and connections