Maico TRE 1,6 S-2 ESS 20 Instructions D'installation Et D'exploitation page 9

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Risk to life due to electric
shock if the 5-stage
transformer is insufficiently
DANGER
attached.
 Suitable attachment material
must be provided on site!
For the electrical installation and
i
installation of the device, strictly
observe the relevant regulations, in
Germany, in particular DIN VDE 0100
with the applicable parts.
 Securely attach the 5-stage transformer
with screws to the foot bracket with the
switch panel.
 Attach the 5-stage switch in the front of the
switch cabinet. Observe the following hole
and clearance dimensions.
 Carry out the electrical connection to the
connection terminal of the 5-stage
transformer in accordance with the wiring
diagram, refer to the wiring diagrams on
Page 5...7 of these installation instructions.
Protection of the 5-stage transformer
i
must be carried out on site.
Protection of the device (refer to the
table right) must be provided on site.
Installation plates for the types TRE1.6 S-2
and TR0.8 S-2 are enclosed for installation
on a support rail TS35. These must be
attached using 2 screws to the foot plate of
the transformer in accordance with the
installation figure below.
(Torque: 2.5Nm).
Startup
Before startup, install all system components
according to their operating instructions.
 Verify agreement with the technical data,
see type plate.
 Switch on the mains fuse.
 Perform a function test in all 5 speed levels.
Self-locking nut M4
Foot plate transformer
Installation plate
U-washer M4
Screw M4x10
9

Publicité

Table des Matières
loading

Produits Connexes pour Maico TRE 1,6 S-2 ESS 20

Table des Matières