SBI AC01462 Manuel D'installation page 3

Extension de l'unité de stockage
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION
1.
Remove the screws from the tank top panels lid and remove the lid. Keep the screws and
hinges
removed.***It is very important to insert the extension between the first and
second section, to keep the tank watertight and moisture free.
2.
Remove the upper section, the stiffener and the
screws from the base.
Installation -Storage Tank Extension
32x
30155 (32x)
28x
30130 (28x)
3.
Install the G pieces on the ends of the
tank.
8 x
30130 (8x)
3

Publicité

Table des Matières
loading

Table des Matières