afriso ProCalida EF1 Manuel D'utilisation page 40

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 46
Max. 1 x
F
6.2
Performing the pressure test and the function test
1. Perform a pressure test with 6 bar.
- The system pressure must remain constant for at least two hours (max-
imum pressure drop 0.2 bar)
2. Perform a leak test after the two hours have passed.
3. Fill the system with water until the operating pressure is reached.
6.3
Adjusting the flow valves
6.3.1
With flow meter
Commissioning
A
10.Open the vent screw by a
maximum of one turn (F).
1. Open the flow valve until the cal-
culated water volume (A) is indi-
cated at the flow meter.
2. Turn the adjustment ring all the
way to the mechanical stop of the
flow valve.
ProCalida® EF 1
EN
18

Publicité

Table des Matières
loading

Table des Matières