Devon & Devon Savoy X Instructions De Montage page 30

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 56
11)
With an iron bit, pre-drill the uprights of the shower enclosure
in two points, one at the top and one at the bottom.
12)
Insert the screws (F) into the holes and then cover them with
the plugs (H).
29
E
N
G

Publicité

Table des Matières
loading

Table des Matières