Installation Steps; Parts Checklist - ClearSounds A300 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION STEPS

Installation of your ClearSounds
®
A300 DECT 6.0 Cordless
Phone with Sound Boost is easy. There are some basic steps
you need to take when you set-up your phone for the first
time.
If, at any time, you have questions about your phone after
reading this manual, please contact the ClearSounds
®
Customer Service Department at 1-800-965-9043.

1. PARTS CHECKLIST

Check the contents of the box - The A300 should contain:
Phone base Cordless Handset
Batteries
Phone Line Cords
AC Adapter
Carrying Clip
User Manual
2. PHONE INSTALLATION
The phone should be located in an area where it is easy to see
the visual display and lighted ringer. Choose an area near a
phone wall jack (RJ11C) and power outlet. The phone may be
placed on a shelf or table or may be fixed to the wall. To avoid
potential interference, the phone should not be located near
electronic equipment, such as personal computers, television
or microwave ovens.
Begin by removing the clear plastic Caller ID protective tab.
This film tab is only for display and to protect your Caller ID
display during shipping.
12 – ENGLISH

Publicité

Table des Matières
loading

Table des Matières